REQUEST FOR PROPOSAL

EBS Wireless Broadband Network Design, Deployment, and Operations
COLORADO RIVER INDIAN TRIBES

October 5, 2026

ISSUED BY:
Colorado River Indian Tribes
Tribal Council
26600 Mohave Rd.
Parker, AZ 85344

Important legal notice: Nothing in this RFP or any resulting contract shall be construed as a waiver of the sovereign immunity of the Colorado River Indian Tribes.

 

  1. General

CRIT is soliciting proposals from qualified design-build entities to deliver an integrated wireless broadband project consisting of two coordinated scopes under a single procurement.

Scope A is a mandatory point-to-point (PtP) institutional transport/backbone network using CRIT’s 2.5 GHz Educational Broadband Service (EBS) spectrum and related facilities as appropriate. This scope is tied to CRIT’s EBS Tribal Priority Window license performance obligations and must be engineered so that CRIT can rely on the resulting operating links for FCC compliance.

Scope B is a mandatory point-to-multipoint (PtMP) access network serving the ACA grant locations identified in the attached service-location schedule. This scope is funded separately from the EBS compliance scope and must therefore be priced, invoiced, documented, and asset-tracked separately even where infrastructure is shared.

CRIT is not seeking a generic feasibility study or a high-level concept paper. CRIT seeks a practical, field-verifiable, design-build solution that can be permitted, constructed, placed into operation, tested, documented, and accepted.

  • Serve all mandatory PtP institutional endpoints identified in Attachment 2 through an operational PtP network and associated transport architecture.
  • Serve all ACA PtMP service locations identified in Attachment 3 through an operational PtMP access network, including associated base-station, backhaul, and subscriber-side components required by the proposer’s design.
  • Use the provided CRIT candidate tower locations as the baseline starting point for design, validate them in the field, and identify any new or alternate sites required to complete the work.
  • Provide a current FCC compliance approach based on 47 C.F.R. § 27.14(u) and current FCC guidance applicable to Tribal Window licenses.
  • Provide separate pricing, schedule logic, schedules of values, invoicing support, and asset identification by funding source/scope.

(more…)

The Colorado River Indian Tribes (CRIT) is accepting bids from qualified contractors for the installation of 14 Septic system across the reservation.  The project consists primarily of abandoning existing septic tanks and installation of new septic systems at various locations throughout CRIT.

Work will include abandoning existing septic tanks and installation of new septic tanks, drainfields, distribution boxes, associated piping and appurtenances, and related work required by the project plans and specifications.

Pre-Bid Conference: Friday, October 2, 2026, at 10:00 AM

Location: CRIT Utilities Transfer Site, 26600 Mohave Road, Parker, AZ 85344

Request for Information Deadline: Friday, October 9, 2026

Bid Due Date: Friday, October 30, 2026, at 4:00 PM (Arizona Time)

Bid Submission Location: CRIT Utilities Transfer Site, 26600 Mohave Road, Parker, AZ 85344

Interested contractors should contact Alex Covarrubias, CRIT Utilities Director, and copy David Akakpo, IHS Field Engineer, to request a complete electronic copy of the bidding documents.

Alex Covarrubias

CRIT Utilities Director

Alex.Covarrubias@crit-nsn.gov

(928) 575-6417

The Colorado River Indian Tribes (CRIT) is accepting bids from qualified contractors for improvements to the CRIT water distribution system. The project consists primarily of replacing 16 inoperable water valves and 24 fire hydrants at various locations throughout CRIT.

Work will include removal and replacement of the existing valves and hydrants, associated piping and appurtenances, surface restoration, testing, disinfection, and related work required by the project plans and specifications.

Pre-Bid Conference

Date/Time: Wednesday, September 9, 2026 at 10:00 AM (Arizona Time)

Location: CRIT Utilities Transfer Site, 29550 Highway 95, Parker, AZ 85344

GPS Coordinates: 34.158081, -114.250889

(Use of GPS coordinates is recommended, as the Transfer Site can be difficult to locate by street address.)

 The pre-bid conference is informational, and attendance is not required to submit a bid. Interested contractors may attend in person or virtually via Microsoft Teams.

 The conference will provide prospective bidders an opportunity to learn more about the project and ask questions regarding the bidding documents and proposed work. Any changes or clarifications to the bidding documents resulting from the conference will be issued by Addendum to all plan holders. (more…)

The Colorado River Indian Tribes is now accepting proposals from qualified contractors for the CPUC Broadband Deployment Phase III project. This project will expand high-speed fiber optic broadband infrastructure to the Parker Dam area, helping bring reliable internet access to more homes and strengthening connectivity for our communities.

The selected contractor will be responsible for furnishing, installing, splicing, and testing outside plant fiber optic infrastructure in accordance with project plans and specifications while meeting all applicable Tribal, state, and federal requirements.

Proposal Due Date: Thursday, September 10, 2026
Time: 1:00 PM (Arizona Time)

Qualified contractors are encouraged to review the complete Request for Proposals, project specifications, bid sheet, and construction plans before submitting a proposal. Together, we continue building the infrastructure that will support future generations through expanded broadband access and economic opportunity.

CRIT_CPUC_Phase 3 Vendor Bid Sheet_06.11.2026
CRIT_CPUC_Phase 3 Project Specifications_06.11.2026
CRIT CPUC Phase III RFP_08.10.2026
CRIT_CPUC_Phase 3_Construction Plans_06.11.2026