The Colorado River Indian Tribes is now accepting proposals for CPUC Broadband Deployment Phase II for the construction of outside plant fiber optic infrastructure in the Blythe Fiber to the Premise project area. This project includes furnishing, installing, splicing, and testing fiber optic infrastructure, with the full bid package including the Request for Proposal, engineering plans, construction specifications, and vendor bid sheet. See the links below for details.
CRIT CPUC Phase II RFP_04.09.2026
Appendix A_CRIT CPUC_Phase 2_Construction Plans_Sealed_04.09.2026
Appendix B_CRIT_CPUC_Phase 2 Contractor Bid Sheet_04.09.2026
Appendix C_CRIT_CPUC_Phase 2 Project Specifications_04.09.2026