Notice to Contractors: The Colorado River Indian Tribes has issued Addendum 1 for the CPUC Broadband Deployment Phase I Request for Proposals for the construction of outside plant fiber optic infrastructure. This addendum includes answers to questions discussed during the March 17 pre-bid meeting, along with revisions to the construction specifications. Proposers are required to acknowledge receipt of Addendum 1 in the cover letter of their proposal.
Click the link for details
Reclamation Acts to Protect Colorado River System During Historic Drought
The prolonged drought combined with the lowest winter snowpack on record is requiring swift actions to protect this vital water system WASHINGTON – Long-term drought has reduced Colorado River system storage to about 36 percent of capacity, and